![]() This number will increase to 24 gates by 2025. Presently the terminal has 17 gates: 12 contact gates and 5 walk-out aircraft positions. is therefore planning further investments of nearly $300 million to further expand the terminal building. Completed in June 2008, the new configuration of the airport now enables it to handle 1.4 million passengers a year.īased on the passenger figures for 20, it became clear that the terminal building would reach its design capacity by 2012. Fifty-four percent of the financing was provided directly by Aéroport de Québec inc. The modernization included a reconfiguration of the terminal on 2 levels, a restructuring of the baggage handling area and arrivals area, as well as a reconfiguration and enlargement of the waiting rooms. īeginning in 2006, with a budget of $65.8 million, Québec/Jean Lesage International Airport underwent a modernization designed to increase the terminal's capacity and substantially enhance the level of passenger service. The current terminal building has a capacity of 1.4 million passengers annually. The airport is managed and operated by Aéroport de Québec inc., a non-profit and non-share corporation. ![]() First known as the Aéroport de l' Ancienne Lorette, then the Aéroport de Sainte-Foy, and later the Aéroport de Québec, it was renamed to Aéroport international Jean-Lesage in 1993, in honour of the former Premier of Quebec, Jean Lesage. ![]() First established as a training facility for air observers, the first flight occurred on September 11, 1941. The airport was established in 1939, a year after the closure of the Aérodrome Saint-Louis.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |